Use this screen to define the options you will use when operating Costpoint Material Requirements Planning. Most of the parameters control how MRP will perform its functions, but you can use the Default Values group box to define default values for planned orders.
Use this block to establish company settings that relate to MRP processes.
Select this check box to exclude customer repair Manufacturing Orders (MOs) as a source of MRP supply.
Select this check box to include partially released manufacturing bills of material when creating requirements.
Select this check box to have Costpoint Material Requirements Planning calculate the estimated cost of planned orders and exception messages.
Use this check box to match the available supply with the demand dates that fall within the threshold that was set up for early/late filters when you generate material requirement plans.
Use the drop-down list to select how extra quantities of purchased parts will be allocated if minimum lot size conditions exist. Options are:
Ignore — Select this option to leave the extra quantities unordered.
Allocate — Select this option to allocate the extra quantities to the same inventory abbreviations requiring the material on a weighted-average basis. This is the default.
Common Stock — Select this option to allocate the extra quantities to a common stock inventory abbreviation.
Use the drop-down list to select how extra quantities of manufactured parts will be allocated if minimum lot size conditions exist. Options are:
Ignore — Select this option to leave the extra quantities unordered.
Allocate — Select this option to allocate the extra quantities to the same inventory abbreviations requiring the material on a weighted-average basis. This is the default.
Common Stock — Select this option to allocate the extra quantities to a common stock inventory abbreviation.
Use the drop-down list to select how planners are assigned by the material requirements planning (MRP) process.
Demand Requirement — Select this option to assign planner from gross requirement. If this option is not available, the planner assignment defaults to the planner assignment by PC Setting.
Inventory Project — Select this option to assign planner from inventory project. If this option is not available, the planner assignment defaults to the planner assignment by gross requirement or from the MRP Settings Default Planner.
PC Setting — Select this option to assign planner from the PC setting. The PC setting planner assignment is set by:
Part
Commodity
Inventory Project or Netting Group
If these PC Setting options are not available, the planner assignment defaults to the planner assignment from gross requirement or from MRP Settings Default Planner.
Use this group box to specify options you want to include as demand.
Select this check box to include pending or in-approval sales orders as a source of MRP demand.
Select this check box to include pending inventory requests as a source of MRP demand.
Select this check box to include project safety stock as a source of MRP demand.
Use this group box to specify action message screen options.
Select this check box to allow maintenance of manufacturing orders in the Maintain MRP Action Messages screen.
Select this check box to allow maintenance of purchase orders in the Maintain MRP Action Messages screen.
Select this check box to allow maintenance of reservations in the Maintain MRP Action Messages screen.
Use this field to enter the days needed to pack the parts required on sales orders. This will be subtracted from the ship-by date to determine the need date.
Use this drop-down list to choose how to apply part order policy rules when executing the Update Material Requirements Plan application. Valid options are All Parts, Assemblies Only, and None.
Use this drop-down list to select the method you want to use for assigning the warehouse into planned orders that are generated by MRP and MPS processes.
Use this group box to specify default values.
Select this check box to set the default to combine planned orders with each other for parts purchasing.
Select this check box to set the default to combine planned orders with each other for parts manufacturing.
Use this field to enter, or use to select, the requisition approval process to be assigned to requisitions if an approval process cannot be automatically assigned.
Use this field to enter, or use to select, the planner to be assigned to requisitions and manufacturing orders if a planner cannot be automatically assigned.
Use the drop-down list to select the transfer type to be assigned to the transfer reservation created in Costpoint Material Requirements Planning. Options are Standard and Borrow/Payback.
Use this drop-down list to select the default MRP option code to be assigned to new inventory projects. Available options are:
Project-No CS — For common stock and non-common stock parts, supply and demand calculations are based only on the specified inventory project.
Project-CS — For common stock parts, supply and demand calculations include the specified project, along with other projects that have an MRP Planning Option Code of Project-CS, Top-Level Project-CS, Netting Group-CS, or All Projects. For non-common stock parts, supply and demand calculations are based only on the specified project.
Top-level Project-No CS — For common stock parts, supply and demand calculations are based on the specified inventory project, along with other projects that have the same top-level project as the specified project and have an MRP Planning Option Code of Top-level Project-No CS. For non-common stock parts, supply and demand calculations are based on the specified inventory project, along with other projects that have the same top-level project as the specified project and have an MRP Planning Option Code of Top-level Project-No CS or Top-level Project-CS.
Top-level Project-CS — For common stock parts, supply and demand calculations include the specified project, along with other projects that have an MRP Option Code of Project-CS, Top-Level Project-CS, Netting Group-CS, or All Projects. For non-common stock parts, supply and demand calculations are based on the specified inventory project, along with projects that have the same top-level project as the specified project and have an MRP Planning Option Code of Top-level Project-No CS or Top-level Project-CS.
Netting Group-CS — For common stock parts, supply and demand calculations include the specified project, along with other projects that have an MRP Option Code of Project-CS, Top-Level Project-CS, Netting Group-CS, or All Projects. For non-common stock parts, supply and demand calculations are based on the specified inventory project, along with other projects that have the same netting group as the specified project and have an MRP Planning Option Code of Netting Group-CS or Netting Group-No CS.
Netting Group-No CS — For common stock parts, supply and demand calculations are based on the specified inventory project, along with other projects that have the same netting group as the specified project and have an MRP Planning Option Code of Netting Group-No CS. For non-common stock parts, supply and demand calculations are based on the specified inventory project, along with other projects that have the same netting group as the specified project and have an MRP Planning Option Code of Netting Group-CS or Netting Group-No CS.
All Projects — For common stock parts, supply and demand calculations include the specified project, along with other projects that have an MRP Option Code of Project-CS, Top-Level Project-CS, Netting Group-CS, or All Projects. For non-common stock parts, supply and demand calculations include the specified project, along with other projects that have an MRP Option Code of All Projects.
No MRP Planning — Use this option to select inventory rows with a part key that belongs to the selected Inventory Project. MRP will not consider inventory in projects of this type.
Use this block to establish all corporate MRP settings. These options are disabled if your user ID does not have maintenance rights for the company ID when you first log into Costpoint.
Select this check box to run the MRP process separately for each company.
Select this check box to plan MRP supply and demand separately by company.
Select this check box to allow the system to execute the "Net Change" mode (see the Update Material Requirements Plan screen), provided that the MRP Regeneration Flag is N (No). If you do not select this check box, MRP must be run in Full Regeneration mode. Once you have selected this check box, you must run MRP in Full Regeneration mode one more time to ensure that net-change flags have been set properly.
Select this check box to separate all MRP supply and demand by warehouse. If you select this option, you will need to load warehouses on all inventory requisition and Purchase Order (PO) lines. To do this, use the Assign Project Planning Warehouses to Req and PO Lines toolkit.
Select this check box to plan parts that have an MPS Planning Type in the Planning subtask of the Manage Parts screen in Product Definition. If you select this check box, the MRP process will generate action messages and planned orders as if they were flagged as MRP planned parts. Planning MPS parts in the MRP process will eliminate any outstanding MPS planned orders and action messages for that part and replace them with the appropriate MRP equivalent.
Select this check box to create an MRP log file during the MRP process for support purposes.