SELECTED PROJECTS SUBTASK

Use this subtask to assign projects to an alternate project reporting structure. You can attach projects to alternate structures at higher levels than the level of cost collection. Because of this flexibility, you can also include sub-project costs (costs of the project at lower levels than the level attached to the alternate project reporting structure).

Use this subtask initially to assign projects to a new alternate project reporting structure. After the initial linking, only modifications and additions need to be made on this screen.

Projects

Project

This non-editable column displays all projects that can be selected for inclusion in alternate project reporting structures. To select projects, highlight them in this table, then click the Select button to move them to the Selected Projects table.

Name

This column displays the description of each project in the Project column.

Level No

This non-editable column displays the level number of the project.

Project Manager

This non-editable column displays the project manager name for the project.

Project Type

This non-editable column displays the project type.

Customer

This non-editable column displays the customer name for the project.

Project Classification

This non-editable column displays the project classification of the project.

Select

Click this button to move highlighted projects from the Projects table window to the Selected Projects table window.

Deselect

Click this button to remove highlighted projects from the Selected Projects table window, and replace them in the Projects table window.

Selected Projects

Project

This column displays all the projects that were selected to be included in the Alternate Project Reporting Structure. To remove projects from "selected" status, highlight them in this window and click the Deselect button.

Project Name

This column displays the description of each project selected.

Low Lev

If you select the check box in this column, any costs incurred at lower levels of the project in the Selected Projects table are included. If you do not select the check box in this column, only costs incurred at the level of the project in the Selected Projects table are included. This column is used at the time of printing Alternate Project Reporting Structures to allow for the inclusion of sub-project costs for the project selected. This is a required field.