The Project Labor Category (PLC) Defaults subtask lets you set up defaults for the labor operation.
Enter, or click
to select, a project to which you want to assign a default PLC.
Enter, or click
to select, the PLC for this labor operation. The PLCs in the lookup are those that are assigned to the specified project.
This field displays the corresponding description for the PLC that you specify in the PLC field.