The Project Manufacturing features integrate Costpoint with Costpoint Manufacturing Execution and Costpoint Shop Floor Time, which allow you to plan and cost jobs based on project requirements and track details while maintaining the integrity on the manufacturing floor. Also, the integrated accounting, project management, and materials functionalities allow you to resolve day-to-day capacity and resource planning, procurement, inventory, and production issues.
Four screens in Engineering Change Notices were modified to support Project Manufacturing:
Manage Engineering Change Notices — If a routing was originally created in MES, the Manage Engineering Change Notices screen now displays a message informing you that the routing changes will not be implemented in Costpoint.
Print Engineering Change Notice Travelers — The screen now prints a notification at the bottom of the report if the ECN is generated for a change to an existing part routing that was originally created in MES. Such changes are not implemented in Costpoint and must be modified in MES.
Update Approved Engineering Change Notices — The screen now prints a notification at the bottom of the report if the ECN is generated for a change to an existing part routing that was originally created in MES. Such changes are not implemented in Costpoint and must be modified in MES.
View Engineering Change Notice Status — The screen now displays a description for manufacturing order types of M or D, where applicable.