MATERIAL REQUIREMENTS PLANNING PROJECT MANUFACTURING

The Project Manufacturing features integrate with Costpoint Shop Floor Time (SFT) and Costpoint Manufacturing Execution (MES), which allows you to:

Five Material Requirements Planning applications have been modified to support Project Manufacturing:

If a primary routing exists for the build part/rev, but with ROUTING_HDR.MES_FL that is equal to N, and INVT_PROJ.MES_FL is equal to Y (for the build inv abbrev project), any MO routing (or MO routing components) will not be created for the MO. This is to be consistent with the form validation in the Manage Manufacturing Orders application where an MO that is to be exported to MES (MO_HDR.MES_FL = Y) must have a routing that originated in MES.