SET UP ALL APPLICABLE PROJECT MASTER SCREENS

At a minimum, enter data on the Basic Info tab of the Manage Project User Flow, including any needed charging criteria screens, the Mods screen, and the Government Contract Info subtask. The charging criteria screens include the Link Projects/Accounts/Organizations screen, the Link Project/Accounts screen, and the Link Projects/Organizations screen. These screens are needed depending on your selections in the Charging group box on the Basic Info tab of the Project User Flow.

On the Manage Project User Flow, enter projects from the top down. This means that, if you have a project with two levels (a summary level and a detail or cost-collection level), you must enter the summary level before the detail level.

When you enter the summary, or top, level, on the Project Levels subtask of the Manage Project User Flow, you must enter all the information that describes the number of levels that the project has, and the length and description of each level. Remember that the Length of the top level is fixed at the number of digits that you entered on the Configure Project Settings screen. The length of any other levels (level 2 and below) can vary from project to project.

An example of what might go in the level table for a two-level project is as follows:

Level

Length

Description

1

4

Project

2

3

Task

For a four-level project, the table might look like the following:

Level

Length

Description

1

4

Project

2

2

Task

3

3

Location

4

3

Work Order

 

Other information that is required for project setup: