Use this process to select labor rates from the labor rate screens and to calculate the labor rates based on effective dates and rate types. These labor rates are used to calculate revenue and billing.
This process selects labor rates for a PLC from the labor rate screens based on the information on the Manage Rate Sequence Orders screen for a project. After the correct labor rate screen has been identified, this process uses effective dates and rate types to calculate the labor rates and insert them on the Manage Project Labor History and Manage Open Billing Detail screens. The Manage Project Labor History screen is used in the computation of revenue and the Open Billing Detail screen is used in the calculation of bills for hours-based revenue and billing formulas.
The screens that are classified as labor rates screens include Manage Project Labor Categories (PLC), Link Project Labor Category Rates to Projects, and the Link PLC Rates to Employee/Vendor screen. You can have PLCs and related billing rates set up in any or all of these screens. Use the Manage Rate Sequence Orders screen to identify a sequence in which you want the Load Labor Rates process to select labor rates from the labor rate screens. After the correct labor rate screen is identified for a PLC, this process compares the effective date on the Manage Project Labor History and the Manage Open Billing Detail screens to the effective date range in the labor rate screen. This process selects the labor rate for the PLC where the effective date on the Manage Project Labor History and/or the Manage Open Billing Detail screen falls within the date range in the labor rate screen.
The Load Labor Rates process uses the rate type to do the final calculation of the labor rate for the PLC. See the labor rate screens for more information on how rate types are used in the calculation of labor rates. The process inserts the labor rate on the Manage Project Labor History and the Manage Open Billing Detail screens after the correct labor rate is selected and calculated.
If you selected the Use Goal Multipliers for Billable Value Calculations check box on the Configure Project Settings screen, this process inserts labor rates for all projects including projects that are not hours-based. For hours-based projects, the process calculates labor rates as noted previously. For all other types of projects, the process sets the Rate Type field in the labor rates screens to A, and calculates the labor rate by dividing total labor cost by actual hours incurred.
You must run this program before computing revenue, billings, or billable value of cost incurred, and you must initialize PLC labor rates by project before running this program. The Revenue and Billing calculation programs use the labor rate stored in Labor History and Open Billing Detail, respectively, as the basis for revenue and billing amounts on projects with T&M or Loaded Labor formulas.
Note that this program updates labor rates by effective date; therefore, if you have posted labor adjustments, run this program again after posting the adjustments. The Billing Value report also uses the billing rate stored in Labor History, in addition to revenue and billing programs, as the basis for deriving the billing value of costs incurred.
Use the fields in this block to create a new parameter ID or to retrieve a previously saved parameter ID. A parameter ID represents a set of screen selection parameters. After you have saved a parameter ID and its related parameters, you can retrieve them using Query.
You can use the retrieved parameters to produce reports and run processes more efficiently and with greater consistency. The saved parameters are also useful and necessary when you want to run the process as part of a batch job. Many users save a unique set of parameters for each different way they run a report or process. When you select a previously saved parameter ID or parameter description, the associated saved screen selection parameters automatically display as selection defaults. The page setup and print options are also included in the saved parameter ID if there are any. You can change any of the associated selection defaults as necessary.
Enter, or click to select, a parameter
ID of up to 15 alphanumeric characters. Choose characters for your parameter
ID that help identify the type of selections you made in the screen, such
as PERIOD or QUARTERLY.
When you save your record, all the selections made in the screen are stored with the parameter ID. Later, you can retrieve the parameter using Query.
You can use the parameter to run the process more efficiently because you can select the parameter ID with its previously defined screen selections. After the default selections display in the screen, you can override the defaults.
Enter, or click to select, a parameter
description of up to 30 alphanumeric characters.
Use these fields to select the subperiods for which you want to update labor rates. If you need to update more than one period, run the program individually for each period being updated. The Fiscal Year, Period, and Subperiod must be open to update labor rates. Only the transactions that fall on or before this subperiod ending date are evaluated during the Load Labor Rates process.
Use this drop-down list to select the range of subperiods for updating labor rates. Valid options are:
All
One
Range
From Beginning
To End
Enter the fiscal year and period or select one from the drop-down list.
Use this field to enter the subperiod from which you want to begin the process. This field is inactive if you have selected All or From Beginning in the Range Option field.
This non-editable field displays the selected subperiod end date.
Use this field to enter the subperiod through which you want to run this process. This field is inactive if you selected All, One, or To End from the Range Option field. The non-editable field to the right displays the subperiod end date.
This non-editable field displays the selected subperiod end date.
Use these fields to select the projects you want to update in the Manage Project Labor History and/or Manage Open Billing Detail screens. The project range selected must include all projects for which you want to compute billable value, revenue, and/or billing. This process only affects projects with hours-based billing and/or revenue formulas. If you have selected the Use Goal Multipliers for Billable Value Calculations check box on the Configure Project Settings screen, all projects included in this range are affected.
Use this drop-down list to select the range you want to include. Valid options are:
All
One
Range
From Beginning
To End
Enter, or click to select, the starting project for the range for which you want to compute billable value, revenue, and/or billing. If you select All or From Beginning in the Option field, this field is inactive.
Enter, or click to select, the ending project for the range for which you want to compute billable value, revenue, and/or billing. If you select All, One, or To End in the Option field, this field is inactive.
Enter the date that you would like to use for exchanges rates. This date is used only for PLCs that have a rate type of T. The Load Labor Rates process uses the date entered in this field to select the appropriate rate from the Manage Maintain Exchange Rates by Date screen. You must have selected the Use Transactional Currency Billing check box on the Other Info tab of the Manage Project Billing Information screen in order for T rates to be calculated correctly. The date entered in this field is ignored for purposes of currency conversion on projects that do not use T rate types.
Use this group box to select the tables that are updated with the labor rate and rate type.
Select this option to update the labor rate and rate type in the Billing Rate and Rate Type fields on the Manage Project Labor History screen. The Manage Project Labor History screen is used for computation of revenue and billable value.
Select this option to update the Billing Rate and Rate Type fields on the Labor tab of the Manage Open Billing Detail screen. The Manage Open Billing Detail screen is used for the calculation of bills.
Select this option to update the Billing Rate and Rate Type fields on both the Manage Project Labor History screen and the Labor tab of the Manage Open Billing Detail screen. Select this option to update the labor rates for revenue, billing, and billable value computations.
After you have made your selections, click to begin loading rates on the Manage Project Labor History and/or the Manage Open Billing Detail screens.